Find or Sell any Parts for Your Vehicle in USA

Arias Pistons 12.5:1 Compression 82mm Bore Honda B-series on 2040-parts.com

US $499.99
Location:

Orlando, Florida, United States

Orlando, Florida, United States
Condition:New Brand:Arias Manufacturer Part Number:3330420

Categories
WHY CHOOSE US
Arias Pistons 12.5:1 Compression 82mm bore Honda B-Series
Description

Honda/Acura B18c1 DOHC VTEC 
1.8L 
Stock Bore: 82mm
Stroke: 3.433
Rod: 5.430
Head CC: 41.6
Gasket: .028
Deck: .005
Compression Height: 1.180
Dome CC: 6
Compression Ration with Stock Head: 12.5:1 
Required Ring set: 1012303228



Payment is accepted only through Paypal.

We will only ship to the Paypal confirmed shipping address.

Payment for orders should be made within 5 business days.

Sales tax will be charged for orders from Florida.

If you require another payment arrangement, please contact us by email or eBay seller messages.
You may also like this

Frankfurt 2011: 2012 Subaru XV gets unveiled

Thu, 15 Sep 2011

2012 Subaru XV arrives on the Frankfurt stage We did moan – which we have been known to, from time to time – about the tease for the launch of the 2012 Subaru XV at Frankfurt. We moaned because we couldn’t see the point. We couldn’t see the point in Subaru teasing the XV with art photos, particularly when those photos showed a production XV which looked exactly like the concept XV.

First Chevy Camaro, Shelby GT500 to be auctioned for charity

Tue, 06 Jan 2009

Want to buy the first retail versions of two future icons? Get ready to pony up--for charity. General Motors is auctioning the rights to the first 2010 Chevy Camaro, and Ford is selling the rights to the first 2010 Shelby GT500 at the Barrett-Jackson auction Jan.

Prime Minister visits Jaguar Land Rover

Mon, 17 Feb 2014

DAVID Cameron paid a visit to Jaguar Land Rover’s new Engine Manufacturing Centre at the weekend. The Prime Minister was given a tour of the new plant where he saw the on-going installation of the manufacturing equipment first hand. Based at the heart of the UK, it is ideally located between the company’s three other manufacturing sites at Halewood, Castle Bromwich and Solihull.